Cost-Effectiveness
A production aid does not only cost money to make. The calculation covers the entire service life: design, waiting time, variants, wear, downtime – and the question of whether a part is needed once or a thousand times.
How costs behave
Criterion Additive Tooling-based processes (injection moulding, elastomer, vacuum casting)
One-time effort No tooling Mould or tool – made additively at FIT and therefore faster
Cost per part Change little with quantity Drop significantly once the tooling cost is spread
Change New file New mould or tool modification
Properties Printing materials Original material, true elastomers
There is no fixed quantity threshold. Where the processes typically sit is shown in the Manufacturing strategy .
What drives costs
Volume – in printing, every cubic centimetre counts. So print only the contour and make the rest from profile or plate.
Consumption – plugs and caps are reordered continually; there the unit price decides, not the one-time effort.
Rework – datums, threads, surfaces; for metal, the support structures.
Design – a redesign costs once and can pay for itself through weight, function and error prevention.
Certifications – for example for food, pharma or ESD.
For a fair comparison you need
What the production aid costs today – including design, manufacturing and assembly.
How long you wait for a new or modified one.
How many variants there are and how often they change.
How many parts are consumed per year (plugs, caps, pads).
What an error or downtime costs that the production aid is meant to prevent.
With this information, a reliable comparison can be made in the part check.